Das Schider – Aparthotel Bad Gastein

Historic Haus Schider will be completely renovated by May 2021.

Left to right: Rene Dreier (managing associate), MMag. Erwin Widerhofer (attorney), Reinhard Pacejka (building contractor) Photo credit: Barbara Pacejka Fotografie

BG Invest GmbH

As the investor, BG Invest GmbH is developing the project and will also operate "Das Schider".

 

"In 'Haus Schieder', we have taken over a wonderful establishment that was very well operated and maintained. We are now attempting to further evolve and enhance its wonderful style, thereby taking it to the next generation. We believe that our project melds perfectly with the history and future of this town, contributing to positive developments here as a whole. We work exclusively with regional partners and are all very excited by how positively we have been received and the professionalism of the collaboration." - Rene Dreier, operator and co-investor of 'Das Schider - Aparthotel Bad Gastein'

History of the Building Project

History-rich Haus Schider, which has been operated as a tourism business for many generations, was taken over in January 2021 by BG Invest GmbH and has been visually, technically and conceptually reconceived.

Current Building Progress

The hotel will present a completely new face to the public in the next 3 months, ideally blending into the existing and evolving structure both visually and conceptually (as a hybrid apartment-hotel).  

Straubingerplatz
Straubingerplatz
This listed hotel ensemble from the Belle Époque is being renovated and a new tower added.
Vertical Link
Vertical Link
A pedestrian tunnel is being planned that will connect the “Plateau” station and Stubnerkogel lifts with the old town center.
Hotel Mirabell
Hotel Mirabell
The existing historically listed building is being revitalized and new elements added.
Hotel Metropol
Hotel Metropol
Formerly Hotel Astoria, in future it will be operated as “Hotel Metropol”.
Habsburger Hof
Habsburger Hof
Planned is a modern, hip hotel project “The Comodo” with around 80 beds.
Hoteldorf Grüner Baum
Hoteldorf Grüner Baum
The main building was constructed in 1929, constantly expanded throughout the years.